Back to Basics: In the Know
Back to Basics: In the Know
A closer look at new feedback loop that links PDCA and DMAIC
- Publication:
- Quality Progress
- Date:
- June 2025
- Issue:
- Volume 58 Issue 6
- Pages:
- pp. 56
- Author(s):
- Zapparoli, Jorge E.
- Organization(s):
- Lockheed Martin Space, Littleton, CO
Abstract
Quality engineering feedback ensues when the quality system’s output is routed back as inputs because of the plan-do-check-act cycle and define, measure, analyze, improve and control steps. This cyclic cause-and-effect chain forms a circuit loop. Quality continuous improvement feeds back into itself, infinitely.