Library
Effective Oversight
The reliability group of a large defense contractor must report to management their progress in meeting Design for Reliability (DFR) objectives. Management is requesting metrics that they can use to track DFR milestones at each milestone in the phase.....
- Filetype: pdf
- Publish date: 2011-01
- Keywords:RAMS 2011 Proceedings, Product Reliability, Design Review, Product Development Planning
A Practical Method for Reliability Analysis of Phased-Mission Systems
This paper presents a practical and computationally efficient method for ac! curate reliability analysis of phased-mission systems...
- Filetype: pdf
- Publish date: 2011-01
- Keywords:RAMS 2011 Proceedings, Product Reliability, Reliability Model, Reliability Analysis/Prediction/Estimation
Modeling the Gain Due to Maintenance Over Transformer Lifespan
This work deals with preventive maintenance tasks on power transformer a! nd their effectiveness over equipment’s lifespan..
- Filetype: pdf
- Publish date: 2011-01
- Keywords:RAMS 2011 Proceedings, Maintainability, Product Reliability, Reliability Model
Reliability and Maintainability in Photovoltaic Inverter Design
Reliability and maintainability in the PV inverter design will be discussed with the emphasis on worst case analysis, component sizing and useful life analysis...
- Filetype: pdf
- Publish date: 2011-01
- Keywords:RAMS 2011 Proceedings, Maintainability, Product Reliability, Reliability Model, Reliability Analysis/Prediction/Estimation
Reliability Growth Planning: Its Concept, Applications, and Challenges
Reliability growth planning (RGP) is emerging as a promising technique to address the reliability challenges arising from the distributed manufacturing environment...
- Filetype: mp4
- Publish date: 2010-11
- Keywords:Webinar,Design Reliability, Product Reliability, Reliability Analysis/Prediction/Estimation
Intermediate Failure States in Simulation-Based Launch Vehicle Risk Study
This paper concerns the risk assessment of a crewed launch vehicle on a mission to reach low earth orbit...
- Filetype: pdf
- Publish date: 2010-01
- Keywords:RAMS 2010 Proceedings, Product Reliability, Failure Analysis/ Physics of Failure, Risk Assessment
Physical Simulation in Space Launcher Engine Risk Assessment
The safety and reliability of crewed launch vehicles are design driving criteria. The success of such vehicles is contingent on the ability to meet mission requirements, while keeping the risk to the crew at an acceptable level...
- Filetype: pdf
- Publish date: 2010-01
- Keywords:RAMS 2010 Proceedings, Product Reliability, Risk Assessment
Transcending Performability for System Attributes’ Consistency
For complex systems where different perspectives need to be addressed, maintaining consistency among various system analyses is a challenge. A framework that supports a global view to govern various analyses is critical for integrity of system analyses...
- Filetype: pdf
- Publish date: 2010-01
- Keywords:RAMS 2010 Proceedings, Reliability Model, Requirements Flow Down, Product Development Planning
Code of Practice
Safety Critical Items List concept of our MIL-STD-882 standard has been..
- Filetype: pdf
- Publish date: 2010-01
- Keywords:RAMS 2010 Proceedings, Product Reliability, Requirements Flow Down, Maintainability
Degraded Systems with Multiple Performance Parameters
The reliability of degraded systems with multiple performance para!..
- Filetype: pdf
- Publish date: 2010-01
- Keywords:RAMS 2010 Proceedings, Reliability Analysis/Prediction/Estimation, Reliability Model, Product Reliability




