ASQ - Electronics and Communications Division

Risk Informed Design Modeling Process

Abstract: ã 2010 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must first be obtained from the IEEE.

As demand for highly reliable complex systems increases,engineers are being forced to consider the risk implications of design decisions earlier in the conceptual phase of projects and with greater accuracy. Standard probabilistic risk assessments (PRA) usually employed to verify that a product meets requirements are too resource intensive and too slow to keep up with the speed at which the design is maturing; while classical qualitative methods do not provide the level of detail and granularity required by the designers to make high-quality risk informed decisions. The Altair design team was able to overcome these challenges by employing a process of Risk Informed Design utilizing the Valador Reliability Tool [1] (VRT). This tool is able to quickly and accurately produce estimates of the risk of Loss of Mission (LOM) and Loss of Crew (LOC) per mission and provide insight to the designers as to how their decisions will impact overall mission success. The VRT employs a method or risk assessment that is unlike traditional PRA as it effectively engages the designers in the model building process and as a result of this increased Designer – Analyst interaction both the quality of the design and the quality of the PRA model is increased.

Keywords: RAMS 2010 Proceedings - Conceptual Design - Reliability Model - Reliability

Already a member? Access this Content

You will need Adobe Reader to view this PDF document.
Download the free Reader from Adobe

  • Print this page
  • Save this page

Average Rating

Rating

Out of 0 Ratings
Rate this item

View comments
Add comments
Comments FAQ

ASQ News

 

RAMS 2019